错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Research on Construction Scheme for a Four-Span Continuous Slanting Heterotypic Stay Cable Arch Bridge

  • Yufeng Xu,
  • Zihui Li,
  • Zhantao Zhang

摘要

The complex shape of heterotypic stay cable arch bridge have led to challenges in structural analysis and construction. This paper, based on the Echeng Bridge project in Huizhou City, introduces a bridge construction scheme. Finite element software is used to simulate the construction process. The analysis results indicate that the stress, deformation, and cable forces in the bridge during the construction process meet the requirements specified by materials and regulations. The proposed bridge construction scheme is considered feasible, and the simulation analysis results can serve as theoretical reference values for bridge construction monitoring. The findings provide valuable insights and guidance for future similar bridge construction projects.