错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Comparing Prestressed Wales System and Traditional Shoring System Method for a Deep Excavation Using Bored Pilling Wall in Ho Chi Minh City

  • Nghia Trong Le,
  • Vien Ngoc Truong,
  • Kien Trung Nguyen

摘要

Deep excavation is one of the most sophisticated stages during structural construction, because of its high-cost and time-consuming nature. Shoring system is a customary method when it comes to basement excavation support in Ho Chi Minh City. However, this method suffers from a number of pitfalls, such as limited workspace, prolonged installation, and very expensive. Accordingly, this manuscript presents a novel earth retention system, namely prestressed wale system, in which the work ability and cost of the novel system are compared with those of its traditional counterpart. Through a comprehensive comparison, the advantages of the prestressed wale system are highlighted, for example, speeding up the excavation procedure and saving material and labor costs.