错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Phases of Planning and Designing

  • Ajay Garg

摘要

Building a hospital is a complex, long-term process executed in various phases: (1) Planning: Focuses on the promoter’s “wishlist,” master planning, pre-design considerations, feasibility reports, and DPR; (2) Schematic Design: Involves initial outlines, space allocation, and room layouts; (3) Construction Documents: Converts detailed drawings into cost estimates and construction plans; (4) Design and Development: Includes drawing hospital units, incorporating fixtures, furniture, and decor; (5) MEP Planning: Involves mechanical, electrical, and plumbing services planning; (6) Construction: Step-by-step erection of the hospital building; (7) Equipment Planning: Determines equipment requirements and specifications; (8) Man Power Planning: Assesses manpower needs and handles recruitment; (9) SOP: Finalizes standard operating procedures, rules, regulations, and rate lists; (10) Commissioning: Involves testing services, equipment, staff training, and disinfection before hospital opening.