错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Construction Players’ Awareness on the Use of Building Information Modelling (BIM) and Industrialized Building System (IBS) in Malaysian Construction Industry

  • Mohamad Zain Hashim,
  • Idris Othman,
  • Nur Syahirah M. Khalid,
  • Siti Hafizan Hassan,
  • Muriatul Khusmah Musa

摘要

The Public Work Department's (JKR) strategic plan for 2020–2025 aims to implement BIM in 50% of projects, increasing by 10% annually. BIM promotes collaboration, while IBS represents prefabrication in Malaysia. Construction companies invest in BIM and IBS to meet client demands, gradually incorporating them into projects. Challenges arise due to the lack of standardized guidance and resistance to change. Businesses establish BIM units and training programs to address these issues. BIM facilitates technology adoption and changes in management practices. The government encourages BIM and IBS for sustainable construction. IBS provides cost and time savings, increased productivity, and higher quality output. A questionnaire survey examines awareness of BIM and IBS in Malaysia's construction industry. Most industry players are aware of IBS adoption (90.2%) and BIM use (80.4%), with positive responses on their benefits and challenges.