Pipe box tunnel (PBT) is a trenchless construction technique trending in a situation where the conventional open-cut-and-cover method is not feasible due to the presence of critical above-ground structures or the necessity to maintain the functionality of the main roads. Limited studies or methods exists for estimating the maximum ground surface settlement in the construction of pipe box tunnels, especially when compared to conventional bored tunnelling. This study utilises finite element analyses to investigate the impact of volume loss and cover depth on ground surface settlement in pipe box tunnelling. A chart was developed for the initial estimation of maximum ground surface settlement in pipe box tunnelling projects.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Estimation of Ground Surface Settlement in Pipe Box Tunneling

  • E. Woon

摘要

Pipe box tunnel (PBT) is a trenchless construction technique trending in a situation where the conventional open-cut-and-cover method is not feasible due to the presence of critical above-ground structures or the necessity to maintain the functionality of the main roads. Limited studies or methods exists for estimating the maximum ground surface settlement in the construction of pipe box tunnels, especially when compared to conventional bored tunnelling. This study utilises finite element analyses to investigate the impact of volume loss and cover depth on ground surface settlement in pipe box tunnelling. A chart was developed for the initial estimation of maximum ground surface settlement in pipe box tunnelling projects.