As a developing country, Peru has great limitations in the application of new and innovative technologies in the construction sector. Construction projects consist of several stages in their development, one of the most important is the planning stage, which is essential to achieve efficient execution and meet established deadlines. However, this stage is usually tedious and complicated to carry out since there are multiple factors that can affect the estimates obtained from the planning process. However, the deadlines for the execution of construction projects are tight and failure to comply generates large losses of money. That is why this article seeks to implement the Lines of Balance (LOB), Last Planner System (LPS) and Building Information Modeling (BIM) methodologies to the traditional procedure. First, surveys were conducted on three different construction projects to determine the traditional planning process. Secondly, a procedure is developed to integrate the 3 aforementioned methodologies. Finally, the process was applied in a building project. A comparative analysis was carried out between the current state of the project and the state after using the aforementioned procedure. As a result, execution speeds increased for the items that maintained the same amount of work, the amount of m3 of slab emptying increased by 33.33%. It was observed that in the planning and work execution phase, the procedure improves the speed of execution of the items.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Procedure to Improve Execution Speed Through Optimized Planning with Lob, Lps and Bim Methods in a Multifamily Building in Metropolitan Lima

  • Nicholas Pereda,
  • Jairo Ríos,
  • Karem Ulloa

摘要

As a developing country, Peru has great limitations in the application of new and innovative technologies in the construction sector. Construction projects consist of several stages in their development, one of the most important is the planning stage, which is essential to achieve efficient execution and meet established deadlines. However, this stage is usually tedious and complicated to carry out since there are multiple factors that can affect the estimates obtained from the planning process. However, the deadlines for the execution of construction projects are tight and failure to comply generates large losses of money. That is why this article seeks to implement the Lines of Balance (LOB), Last Planner System (LPS) and Building Information Modeling (BIM) methodologies to the traditional procedure. First, surveys were conducted on three different construction projects to determine the traditional planning process. Secondly, a procedure is developed to integrate the 3 aforementioned methodologies. Finally, the process was applied in a building project. A comparative analysis was carried out between the current state of the project and the state after using the aforementioned procedure. As a result, execution speeds increased for the items that maintained the same amount of work, the amount of m3 of slab emptying increased by 33.33%. It was observed that in the planning and work execution phase, the procedure improves the speed of execution of the items.