错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Temperature Control Simulation of Rock Wall Crane Beam Based on Cooling Water Pipe

  • Chuncheng Ma,
  • Haoming Zhang,
  • Shuangquan Xu,
  • Xiji Li

摘要

Currently, the problem of concrete cracks is one of the common quality problems that is difficult to solve in the field of water conservancy and hydropower engineering. In order to study the distribution law of concrete temperature field during the construction period of underground cavern rock wall crane beams, different cooling water pipe arrangements were adopted to simulate and analyze the internal temperature and stress of concrete. The results show that the three-layer parallel cooling water pipe arrangement has the best cooling effect and can effectively control concrete cracking.