错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Research on the Evaluation of the Load Regulation Capability in the Integrated Energy System Industrial Park

  • Li Fang,
  • Sun Lu,
  • Liu Hechuan,
  • Zhao Fei,
  • Wang dandan,
  • Yang Xiaoyu

摘要

The integrated energy system industrial park can comprehensively use different energy sources such as grid power, distributed power generation, and natural gas to meet the cooling, heating, and power demands of the industrial park. For integrated energy systems connected to external power grids through substations, the power grid needs the assistance of the integrated energy system load to cut peak and fill the valley. When it is difficult to expand the capacity of the substation, the power demand of the load on the power grid can also be reduced through the automatic adjustment capability of the park. In order to evaluate the demand regulation capability of integrated energy system parks, this paper studies the production simulation methods of integrated energy systems. By setting different research objectives, it provides an evaluation method for the load regulation capability of integrated energy system parks. Finally, a numerical example is provided to verify the method.