Comparative Analysis of Modular SPMT Load Out Methods
摘要
This research takes a module structure platform project in Bohai as an example, and arranges two different SPMT loading plans for the completed module structure on land, namely the north-south support beam SPMT loading plan and the north-south support column SPMT loading plan. A relevant load out model was established using SACS software, and the two load out schemes were calculated and analyzed. The results were compared, providing a reference for similar modular platform projects in the future to use SPMT loading.