错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Study on Water Flooding Quantification Method of Interwell Injection and Production

  • Qi Qin

摘要

In view of the difficulties of water injection adjustment and low efficiency of manual adjustment caused by overlapping well patterns and complex injection-production relationship when P oilfield enters the ultra-high water cut stage, this paper establishes the calculation method of injection-production flow component by using the principle of material balance and comprehensively considering formation coefficient, quality of inter-well connectivity, inter-well position and seepage characteristics. The quantification of the injection-production relationship between oil and water Wells in the sedimentary unit can provide a theoretical basis for the automation of measure adjustment, and lay a foundation for the high-quality and efficient adjustment of multi-layer and multi-well group water injection under the condition of multi-well pattern in the late period of extra-high water cut.