Delay Risk Assessment for Job Shop Scheduling Considering Uncertain Processing Times
摘要
This study expresses the uncertainty of manufacturing processing time as a random variable and proposes a new production schedule evaluation method based on the probability distribution. We obtained results by using this proposed method. The results were compared with simulation results in order to clarify the effectiveness of the proposed method.