The distributed permutation flowshop scheduling problem (DPFSP) has piqued the interest of researchers in recent years due to its applicability in real-world scenarios. In this paper, we address DPFSP to minimize total flowtime, which is a relevant and important criterion for dynamic manufacturing environment but not much discussed for this problem. Since, the DPFSP is known to be NP-hard, we focus on approximate approaches and propose two constructive heuristics based on different techniques. To evaluate the effectiveness of the proposed heuristics, we test them on a benchmark set of 720 large-sized instances. A comprehensive computational analysis shows that the proposed heuristics solve the problem in a reasonable computational time and perform significantly better than the best performing constructive heuristics from the literature.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Improved Constructive Heuristics to Minimize Total Flowtime in Distributed Permutation Flowshop Scheduling Problem

  • Mohd Ayaz,
  • Musrrat Ali,
  • Millie Pant

摘要

The distributed permutation flowshop scheduling problem (DPFSP) has piqued the interest of researchers in recent years due to its applicability in real-world scenarios. In this paper, we address DPFSP to minimize total flowtime, which is a relevant and important criterion for dynamic manufacturing environment but not much discussed for this problem. Since, the DPFSP is known to be NP-hard, we focus on approximate approaches and propose two constructive heuristics based on different techniques. To evaluate the effectiveness of the proposed heuristics, we test them on a benchmark set of 720 large-sized instances. A comprehensive computational analysis shows that the proposed heuristics solve the problem in a reasonable computational time and perform significantly better than the best performing constructive heuristics from the literature.