Scope and Requirements for Each Phase of Survey and Design
摘要
3.1.1 The works of hydrological survey and design in the feasibility study phase shall provide hydrological information and reference for selecting route schemes, propose preliminarily the length of large and medium bridges, and estimate the amount of small bridges, culverts, protective works for submerged subgrade.