Design for Manufacturing and Assembly (DfMA) Strategy for PPVC—A Case Study of Aurora
摘要
In this work, we discuss our project in Desheng Village, Zhang Jiakou, namely Aurora, which was designed and built to demonstrate the adoption of rapid construction strategies for Prefabricated Prefinished Volumetric Construction (PPVC) based on Design for Manufacturing and Assembly (DfMA). Through experimental off-site prefabrication and on-site assembly procedures, this work investigates the feasibility of deploying rapid construction and simultaneous collaboration of multi-technology and multi- participants in the realization of a prefabricated modular volumetric house.