Moving Block in ERJU
摘要
This paper presents the ETCS Moving Block system developed within Europe’s Rail Joint Undertaking (ERJU) programme to address today’s railway capacity constraints by replacing classical operational rules to optimize throughput. The concept was validated through simulations and field trials and future work includes extended field tests, contributing to European interoperability standards.