Slovenská elektrizačná prenosová sústava, a.s. in cooperation with Západoslovenská distribučná, a.s., Vodohospodárska výstavba š.p. and Slovenské elektrárne a.s. carried out a successful test of starting from dark in 2022. The provider of the support service (PpS) “Start from Dark” was the Gabčíkovo hydroelectric power plant. The voltage from the Gabčíkovo hydro power plant was fed to the own consumption of the Bohunice nuclear power plant. During the test, the start-up of all types of appliances of the nuclear power plant's own consumption necessary for its start-up was carried out. For the start-up of the nuclear power plant, process steam is required, which is generated by an electric boiler, which was also part of the test.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Start from Dark Test for the Bohunice V2 Nuclear Power Plant

  • Stanislav Prieložný,
  • Martin Jedinák,
  • Jozef Valiček,
  • Peter Gamboš,
  • Anton Beláň,
  • Felix Skoršepa,
  • Vladimír Šulko

摘要

Slovenská elektrizačná prenosová sústava, a.s. in cooperation with Západoslovenská distribučná, a.s., Vodohospodárska výstavba š.p. and Slovenské elektrárne a.s. carried out a successful test of starting from dark in 2022. The provider of the support service (PpS) “Start from Dark” was the Gabčíkovo hydroelectric power plant. The voltage from the Gabčíkovo hydro power plant was fed to the own consumption of the Bohunice nuclear power plant. During the test, the start-up of all types of appliances of the nuclear power plant's own consumption necessary for its start-up was carried out. For the start-up of the nuclear power plant, process steam is required, which is generated by an electric boiler, which was also part of the test.