A solution that provides a reduction in the terms of “introduction” of products to the market with an increase in the quality of production planning and the formation of relevant information about the products being produced, which provides for the implementation of a software and information model of the phased (portion) launch of design documentation (CD) in production with a parallel consolidated technological preparation This model of preparation and launch of products into production assumes that production processes for product components begin before the completion of the formation of the entire set of design and technological (TD) documentation for the product, which provides significant savings in time and labor resources. In this case, a reduction in terms is ensured due to the launch of nodes and units into production as the CD is ready, without waiting for the CD to be ready for the product as a whole. The process of manufacturing products is optimized, as the DSO warehouses, grouped by start-up batches and manufacturing workshops, are transferred to production.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Aspects of Preparation and Planning of Batch Launch of Design Documentation into Production for Technically Complex Products

  • Oleksii Petrenko,
  • Anna Nenia,
  • Viktor Nenya,
  • Viktoriya Antypenko

摘要

A solution that provides a reduction in the terms of “introduction” of products to the market with an increase in the quality of production planning and the formation of relevant information about the products being produced, which provides for the implementation of a software and information model of the phased (portion) launch of design documentation (CD) in production with a parallel consolidated technological preparation This model of preparation and launch of products into production assumes that production processes for product components begin before the completion of the formation of the entire set of design and technological (TD) documentation for the product, which provides significant savings in time and labor resources. In this case, a reduction in terms is ensured due to the launch of nodes and units into production as the CD is ready, without waiting for the CD to be ready for the product as a whole. The process of manufacturing products is optimized, as the DSO warehouses, grouped by start-up batches and manufacturing workshops, are transferred to production.