Surveys
摘要
This chapter pertains to surveys and inspections during construction, installation and commissioning of the Floating Offshore Wind Turbine including all the items within the scope of classification (refer to Chap. 8 , Sect. 2.1). The documentation requirements for review are given in Chap. 8 of this book. A general quality plan highlighting required surveys together with Class hold points is to be determined by the Fabricator or Owner and agreed upon by the attending Surveyor. For the RNA and tower, the survey scope includes the following two situations.