错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Assessment of LSTM and GRU Models to Predict the Electricity Production from Biogas in a Wastewater Treatment Plant

  • Pedro Oliveira,
  • Francisco S. Marcondes,
  • M. Salomé Duarte,
  • Dalila Durães,
  • Gilberto Martins,
  • Paulo Novais

摘要

Over the decades, we have faced escalating global energy consumption and its consequential environmental impacts, including climate change and pollution. This study explicitly evaluates the use of Long Short-Term Memory (LSTM) and Gated Recurrent Unit (GRU) models for predicting electricity production from the biogas produced in a Wastewater Treatment Plant (WWTP) in Portugal. WWTPs play an essential role regarding environmental sustainability, namely the potential of biogas in mitigating energy consumption’s environmental impact. Also, the work details a comparison between the LSTM and GRU model’s performance, applying a grid-search methodology for hyperparameter optimization. The study employs the Root Mean Squared Error (RMSE) as an evaluation metric and uses the sliding window method to transform the problem into a supervised one. After several experiments, the results demonstrate that the LSTM-based model outperforms GRU-based models, achieving an RMSE of 347.9 kWh.