错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

The First Test Results of the Gyrotron and Waveguide Path of the T-15MD Tokamak in a Long-Pulse Operation

  • I. S. Pimenov,
  • A. A. Borschegovskiy,
  • E. R. Akhmedov,
  • S. V. Neudatchin,
  • V. N. Novikov,
  • V. N. Pavlov,
  • I. N. Roy,
  • S. A. Sevostyanov,
  • N. V. Shapotkovsky

摘要

Abstract

The T-15MD tokamak is equipped with a gyrotron setup, which currently includes one gyrotron with an operating outlet frequency of 82.6 GHz and a power of 1 MW. The length of the waveguide path from the gyrotron to the tokamak is 37 m. A significant result obtained earlier has been the measurement of HF‑radiation power using a small calorimetry load (0.95 MW at a pulse duration of 125 ms). The results of the first joint tests of a gyrotron and a waveguide path for a dummy load in a long pulse operation from a “V-iktoriya” high-voltage power supply are presented. The pulse duration of 9.4 s is achieved. The estimated microwave radiation power is 0.85 MW.