Status of the Production of the Nica Collider Magnetic-Cryostat System. Results of Cryogenic Tests of Superconducting Magnets
摘要
Abstract
The NICA accelerator complex consists of three superconducting rings: the Nuclotron synchrotron, which has been in operation since 1993, the Booster synchrotron, which has been commissioned since 2021, and the collider under construction. The paper presents the production status of elements of the NICA collider magnetic-cryostat system and the results of cryogenic tests of superconducting magnets, including training of superconducting coils, measurements of magnetic field parameters, measurements of static heat leak and dynamic heat releases.