<p>With the ongoing energy transition, power grids are evolving fast. They operate more and more often close to their technical limit, under more and more volatile conditions. Fast, essentially real-time computational approaches to evaluate their operational safety, stability and reliability are therefore highly desirable. Machine Learning methods have been advocated to solve this challenge, however they are heavy consumers of training and testing data, while historical operational data for real-world power grids are hard if not impossible to access. This manuscript presents a large synthetic dataset of power injections in an electric transmission grid model of continental Europe, and describes the algorithm developed for its generation. The method allows one to generate arbitrarily large time series from the knowledge of the grid – the admittance of its lines as well as the location, type and capacity of its power generators – and aggregated power consumption data, such as the national load data given by ENTSO-E. The obtained datasets are statistically validated against real-world data.</p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

A large synthetic dataset for machine learning applications in power transmission grids

  • Marc Gillioz,
  • Guillaume Dubuis,
  • Philippe Jacquod

摘要

With the ongoing energy transition, power grids are evolving fast. They operate more and more often close to their technical limit, under more and more volatile conditions. Fast, essentially real-time computational approaches to evaluate their operational safety, stability and reliability are therefore highly desirable. Machine Learning methods have been advocated to solve this challenge, however they are heavy consumers of training and testing data, while historical operational data for real-world power grids are hard if not impossible to access. This manuscript presents a large synthetic dataset of power injections in an electric transmission grid model of continental Europe, and describes the algorithm developed for its generation. The method allows one to generate arbitrarily large time series from the knowledge of the grid – the admittance of its lines as well as the location, type and capacity of its power generators – and aggregated power consumption data, such as the national load data given by ENTSO-E. The obtained datasets are statistically validated against real-world data.