<p>This paper presents a unified predict–then–optimize framework that links calibrated machine-learning risk models with an evolutionary multi-objective optimizer to plan modular projects under uncertainty. A multi-source dataset, BIM/IFC exports, ERP costs, factory QC logs, transport manifests, and regional electricity factors- feeds tree-based and gradient-boosted models that return distributional estimates of schedule delay, cost overrun, and embodied CO₂e. Model reliability and interpretability are ensured via probability calibration and SHAP analyses, which consistently identify supplier on-time-in-full, defect rates, interface density, route length, load factor, and grid intensity as dominant drivers. These posterior predictive distributions parameterize a stochastic program solved with NSGA-II/III and MOEA/D, evaluated by hypervolume, IGD/GD, spread, and empirical attainment. Results show well-diversified Pareto sets with strong front quality (e.g., hypervolume proxy magnitude ≈ 0.90; IGD ≈ 0.30) and clear managerial “knees,” where small schedule concessions unlock disproportionate cost or carbon savings. Three exemplar plans illustrate actionable trade-offs: a time-lean option achieves 0 days tardiness at 3.69% overrun and 1123.7&#xa0;kg CO₂e; a cost-lean option yields 0% overrun with 5 days tardiness and 292.0&#xa0;kg CO₂e; and a low-carbon option reaches 69.5&#xa0;kg CO₂e with 6 days tardiness and 0.90% overrun. The framework closes the gap between risk quantification and planning, transforming predictive insights into executable, auditable plans that enhance schedule reliability, budget discipline, and decarbonization in modular construction.</p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Multi-objective risk optimization for sustainable modular infrastructure using machine learning and metaheuristics

  • Bader Aldeen Almahameed,
  • Ayman M. Obeidat,
  • Majdi Bisharah,
  • Tamer Shraa,
  • Sajeda Alkhadrawi

摘要

This paper presents a unified predict–then–optimize framework that links calibrated machine-learning risk models with an evolutionary multi-objective optimizer to plan modular projects under uncertainty. A multi-source dataset, BIM/IFC exports, ERP costs, factory QC logs, transport manifests, and regional electricity factors- feeds tree-based and gradient-boosted models that return distributional estimates of schedule delay, cost overrun, and embodied CO₂e. Model reliability and interpretability are ensured via probability calibration and SHAP analyses, which consistently identify supplier on-time-in-full, defect rates, interface density, route length, load factor, and grid intensity as dominant drivers. These posterior predictive distributions parameterize a stochastic program solved with NSGA-II/III and MOEA/D, evaluated by hypervolume, IGD/GD, spread, and empirical attainment. Results show well-diversified Pareto sets with strong front quality (e.g., hypervolume proxy magnitude ≈ 0.90; IGD ≈ 0.30) and clear managerial “knees,” where small schedule concessions unlock disproportionate cost or carbon savings. Three exemplar plans illustrate actionable trade-offs: a time-lean option achieves 0 days tardiness at 3.69% overrun and 1123.7 kg CO₂e; a cost-lean option yields 0% overrun with 5 days tardiness and 292.0 kg CO₂e; and a low-carbon option reaches 69.5 kg CO₂e with 6 days tardiness and 0.90% overrun. The framework closes the gap between risk quantification and planning, transforming predictive insights into executable, auditable plans that enhance schedule reliability, budget discipline, and decarbonization in modular construction.