错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Time-resolved ultra-small-angle X-ray scattering beamline (BL10U1) at SSRF

  • Wen-Qiang Hua,
  • Chun-Ming Yang,
  • Ping Zhou,
  • Feng Tian,
  • Jin-You Lin,
  • Yu-Zhu Wang,
  • Xiao-Yun Li,
  • Xia-Ran Miao,
  • Chun-Xia Hong,
  • Qiu-Shi Huang,
  • Xin-Tong Zhao,
  • Yong-Feng Men,
  • Jie Wang,
  • Xing-Yu Gao,
  • Xiu-Hong Li

摘要

The construction of a new beamline, BL10U1, was completed at the Shanghai synchrotron radiation facility in 2020. This multipurpose beamline was designed to provide X-ray scattering techniques such as ultra-small-angle X-ray scattering (USAXS), small-angle X-ray scattering (SAXS), wide-angle X-ray scattering, and microfocus SAXS (μSAXS) for a broad user community. To realize fast time-resolved USAXS experiments, the beamline adopted an in-vacuum undulator with a total length of 1.6 m as the photon source. An in-house cryogenic-cooled double multilayer monochromator was installed to deliver a photon flux of approximately 1013 photons/s at a photon energy of 10 keV. The three-year successful operation of this beamline demonstrated that the monochromator operated smoothly, as expected. BL10U1 has three end stations in succession: USAXS end station, μSAXS end station, and end station for industrial applications. The minimum scattering vector q ~ 0.0042 nm−1 at 10 keV can be achieved at the USAXS end station equipped with a 28 m-long and 1.8 m-diameter vacuum flight tube. At the μSAXS end station, a beam spot of less than 10 × 8 μm was achieved for micro-SAXS experiments. In contrast, in situ experimental instruments up to 5 m high and 8 m wide can be mounted at the industrial application end station, which offers industrial scientists the opportunity to use their large industrial equipment. BL10U1 opens up a new capability to investigate phenomena such as non-equilibrium and dynamic processes of materials with a wide length scale from angstroms to micrometers with millisecond time resolution. In this paper, we also report beamline design considerations and commissioning results.