Bicriteria Scheduling with Two-Component Jobs on an Unbounded Series-Batching Machine
摘要
Simultaneous optimization makespan and the maximum cost on a unbounded series-batching machine is studied in the paper, in which each job contains a specific component and standard component. Specific components are scheduled separately, while standard components are scheduled in batches. Completing a job means that its two components have been completed. The two components of a job can be scheduled in any order. We present an