<p>A 100-MeV proton linear accelerator (linac) which has been operating since 2013 at Korea Multi-purpose Accelerator Complex (KOMAC) started 24-h beam service in 2024 and neutron beam service in 2025. In addition to the operation for user beam service, it is planned to upgrade the existing 100-MeV accelerator according to the needs of the user community. In this paper, the operation status of KOMAC proton linac is presented and the upgrade plan is summarized.</p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Operation status of KOMAC Linac

  • Hyeok-Jung Kwon,
  • Han-Sung Kim,
  • Young-Gi Song,
  • Sang-Pil Yun,
  • Kyung-Hyun Kim,
  • Hae-Seong Jeong,
  • Seunghyun Lee

摘要

A 100-MeV proton linear accelerator (linac) which has been operating since 2013 at Korea Multi-purpose Accelerator Complex (KOMAC) started 24-h beam service in 2024 and neutron beam service in 2025. In addition to the operation for user beam service, it is planned to upgrade the existing 100-MeV accelerator according to the needs of the user community. In this paper, the operation status of KOMAC proton linac is presented and the upgrade plan is summarized.