错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Superconducting cavities for SCL3

  • Heetae Kim,
  • Sungmin Jeon,
  • Juwan Kim,
  • Junwoo Lee,
  • Moosang Kim,
  • Jongdae Joo,
  • Myung Ook Hyun,
  • Hoe Chun Jung,
  • Hyojae Jang,
  • Youngkwon Kim,
  • Gunn-Tae Park,
  • Mijoung Joung,
  • Yoochul Jung

摘要

The quarter-wave resonator (QWR) and half-wave resonator (HWR) superconducting cavities for the Rare Isotope Accelerator Complex for On-line Experiments (RAON) Superconducting Linac (SCL) 3 have been developed, tested, and installed in the linac. This paper presents the design parameters and fabrication processes for both QWR and HWR cavities. A brief overview of the vertical test setup, a detailed calibration, and cavity preparations for testing the superconducting cavities are described. Q curves for both the QWR and HWR cavities are measured as functions of the accelerating electric field. The performance of these cavities is successfully evaluated through vertical tests, and they are subsequently integrated into cryomodules for installation in the tunnel.