<p>At the river power plant Jochenstein on the Danube in the district of Passau, Bavaria, South-east Germany, the „Donaukraftwerk Jochenstein AG“ (DKJ) plans the construction of a modern pumped-storage hydropower plant with a capacity of 300 megawatts, the so called „Energiespeicher Riedl”. The project has been in the permitting process since 2012 and received now, after 13 years, the permit.</p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Neubauprojekt Pumpspeicherkraftwerk Energiespeicher Riedl

  • Dominik Mayr,
  • Christian Rucker

摘要

At the river power plant Jochenstein on the Danube in the district of Passau, Bavaria, South-east Germany, the „Donaukraftwerk Jochenstein AG“ (DKJ) plans the construction of a modern pumped-storage hydropower plant with a capacity of 300 megawatts, the so called „Energiespeicher Riedl”. The project has been in the permitting process since 2012 and received now, after 13 years, the permit.