An ALNS to optimize makespan subject to total completion time for no-wait flow shops with sequence-dependent setup times
摘要
In this article, we address the no-wait flow shop scheduling problem with sequence dependent setup times. The objective is to minimize makespan subject to an upper bound on total completion time. Although these performance measures and constraints have been extensively studied, they have never been considered together in this problem before. To solve the problem, we propose an adaptive large neighborhood search algorithm called