<p>This study aimed to model and identify the most productive cutting methods of tree plantations by comparing a forward felling technique (C) with sideways techniques outside (A and D) or inside cutting edge (B and E). Drone video material of each tree was analyzed by comparing time distribution of work phases. The relation between this input data and harvester production data was analyzed by regression models. A quadratic model predicted productivity precisely (<i>R</i><sup>2</sup> = 0.95) and explained the effective-hour productivity in cutting cycle with dummy variables of harvesting conditions. The productivity was explained by tree size and cutting cycle time, while effects of operator and harvester were eliminated by statistical analysis. In loblolly pine (<i>Pinus taeda</i> L.) plantations on flat terrain, cutting method B was 4.8 m<sup>3</sup>/E<sub>0</sub>h (effective working hour) more productive than method A, and 6.7 m<sup>3</sup>/E<sub>0</sub>h than method C. In Sydney blue gum (<i>Eucalyptus saligna</i> Sm.) plantations, cutting method E was 1.8 m<sup>3</sup>/E<sub>0</sub>h more productive than cutting method D on sloping terrain. Of the time-cycle variables, time consumption of the “moving of tree” changed significantly between the cutting methods, of which the ones that used the sideways felling technique inside cutting edge were most efficient. This quadratic modeling structure can be recommended for precise studies in similar harvesting conditions.</p> Graphical Abstract <p></p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

An enhanced method for improving the efficiency of harvesting tree plantations on flat and sloping terrain using a cutting-cycle productivity model

  • Teijo Palander,
  • Heikki Ovaskainen,
  • Annamari Lauren,
  • Antti Pasi

摘要

This study aimed to model and identify the most productive cutting methods of tree plantations by comparing a forward felling technique (C) with sideways techniques outside (A and D) or inside cutting edge (B and E). Drone video material of each tree was analyzed by comparing time distribution of work phases. The relation between this input data and harvester production data was analyzed by regression models. A quadratic model predicted productivity precisely (R2 = 0.95) and explained the effective-hour productivity in cutting cycle with dummy variables of harvesting conditions. The productivity was explained by tree size and cutting cycle time, while effects of operator and harvester were eliminated by statistical analysis. In loblolly pine (Pinus taeda L.) plantations on flat terrain, cutting method B was 4.8 m3/E0h (effective working hour) more productive than method A, and 6.7 m3/E0h than method C. In Sydney blue gum (Eucalyptus saligna Sm.) plantations, cutting method E was 1.8 m3/E0h more productive than cutting method D on sloping terrain. Of the time-cycle variables, time consumption of the “moving of tree” changed significantly between the cutting methods, of which the ones that used the sideways felling technique inside cutting edge were most efficient. This quadratic modeling structure can be recommended for precise studies in similar harvesting conditions.

Graphical Abstract