Experience in Construction of a High-Rise Building on a Foundation Base with Underground Excavations
摘要
An experience in the design and construction of a combined footing for a high-rise building in the presence of underground excavations at its basement is presented. A brief review of the construction conditions is presented. Prediction calculations of settlements and the results of their monitoring during the construction process are analyzed. The calculated and actual characteristics of the foundation deformability are compared.