Scheduling with non-renewable resources: minimizing the sum of completion times
摘要
We consider single-machine scheduling with a non-renewable resource. In this setting, we are given a set of jobs, each characterized by a processing time, a weight, and a resource requirement. At fixed points in time, certain amounts of the resource are made available to be consumed by the jobs. The goal is to assign the jobs non-preemptively to time slots on the machine, so that each job has enough resource available at the start of its processing. The objective that we consider is the minimization of the sum of weighted completion times. The main contribution of the paper is a PTAS for the case of 0 processing times (