Underwater Technical Survey of the Downstream Hydraulic Structures of the Kama HPP
摘要
The results of the underwater technical survey of downstream structures of the Kama hydraulic project and the adjacent unstabilized river channel performed in 2023 are presented. The revealed defects and their causes are analyzed.