Scientific and technical issues of the MBIR construction project and their solution
摘要
The construction of a nuclear facility with a multipurpose fast research reactor assumes engineering challenges that require prompt and effective solutions. A wide range of work was carried out to ensure the MBIR project timelines: criterial dependencies for thermal-hydraulic processes in the reverse steam generator were experimentally obtained; compliance of the reactor plant with the requirements of federal regulations was justified in the course of a deterministic and probabilistic safety analysis; a program for trial assembly of the reactor was developed. Successful implementation of these activities will allow the plant to be commissioned within the established deadlines.