<p>The construction of a&#xa0;nuclear facility with a&#xa0;multipurpose fast research reactor assumes engineering challenges that require prompt and effective solutions. A&#xa0;wide range of work was carried out to ensure the MBIR project timelines: criterial dependencies for thermal-hydraulic processes in the reverse steam generator were experimentally obtained; compliance of the reactor plant with the requirements of federal regulations was justified in the course of a&#xa0;deterministic and probabilistic safety analysis; a&#xa0;program for trial assembly of the reactor was developed. Successful implementation of these activities will allow the plant to be commissioned within the established deadlines.</p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Scientific and technical issues of the MBIR construction project and their solution

  • P. S. Dokelin,
  • A. M. Zotov,
  • N. V. Maslov,
  • I. T. Tretyakov,
  • B. M. Yukhnov

摘要

The construction of a nuclear facility with a multipurpose fast research reactor assumes engineering challenges that require prompt and effective solutions. A wide range of work was carried out to ensure the MBIR project timelines: criterial dependencies for thermal-hydraulic processes in the reverse steam generator were experimentally obtained; compliance of the reactor plant with the requirements of federal regulations was justified in the course of a deterministic and probabilistic safety analysis; a program for trial assembly of the reactor was developed. Successful implementation of these activities will allow the plant to be commissioned within the established deadlines.