Efficient algorithms for the bucket wheel reclaimer scheduling problem with sequence-dependent setup times
摘要
The effective management of resources in bulk ports presents substantial challenges, prominently concerning the intricate scheduling of bucket wheel reclaimers (BWRs). These essential machines play a vital role in the reclamation of dry bulk materials, facilitating their loading onto vessels via ship-loaders. The research at hand centers around the BWR scheduling problem, wherein the sequence-dependent setup times and eligibility restrictions of these machines are duly considered. The optimization of BWR schedules holds direct implications for terminal throughput, which is a paramount performance metric for dry bulk terminals. The primary objective revolves around the minimization of total completion times, as it pertains to enhancing the overall efficiency and productivity of the terminal operations. For this