Solving the two-machine open shop problem with a single server with respect to the makespan
摘要
We address in this paper the two-machine open shop problem with a single server to prepare jobs before going through the processing so as to minimize the makespan. The server is only needed during the preparation phase before becoming available again, leaving the prepared job to complete its processing. We present three lower bounds with respect to the makespan. In addition, we show the