错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

An upper bound for the inter-exit time of two jobs in an m-machine flow shop

  • Marcello Urgo,
  • Massimo Manzini

摘要

This paper addresses the class of permutation flow shop scheduling where jobs, after their completion, must be grouped in batches. This is a common scheme in industrial environments, where products undergo multiple process steps in different shops and, when completed, must be transported to customers or the next production step. A new optimisation criterion is used, the inter-exit time, i.e., the difference between the completion times of two jobs. An upper bound is proposed and demonstrated for a general permutation flow shop with m machines.