A polynomial-time approximation scheme for an arbitrary number of parallel identical multi-stage flow-shops
摘要
We investigate the seemingly untouched yet the most general parallel identical k-stage flow-shops scheduling, in which we are given an arbitrary number of indistinguishable k-stage flow-shops and a set of jobs each to be processed on one of the flow-shops, and the goal is to schedule these jobs to the flow-shops so as to minimize the makespan. Here the number k of stages is a fixed constant, but the number of flow-shops is part of the input. This scheduling problem is strongly NP-hard. To the best of our knowledge all previously presented approximation algorithms are for the special case where