<p>For the construction of the 7.4 km long Gloggnitz tunnel an intermediate access consisting of an 1.2 km long access tunnel and two shafts with a&#xa0;depth of 250 m are necessary to start the four tunnel drives from the shaft bottom. To install the necessary equipment for the start of the four tunnel drives two caverns each with a length of 200 m and a&#xa0;cross section of 210 m<sup>2</sup>/lfm were built. This contribution describes the backfilling works of the 85,000 m<sup>3</sup> of cavity built for temporary demands. Requirements for the backfilling materials, installation, and logistical boundary conditions are explained.</p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Verfüllen der Schachtfußkavernen am Baulos SBT 1.1

  • Johann Bauer,
  • Hannes Hauer,
  • Christoph Diewald

摘要

For the construction of the 7.4 km long Gloggnitz tunnel an intermediate access consisting of an 1.2 km long access tunnel and two shafts with a depth of 250 m are necessary to start the four tunnel drives from the shaft bottom. To install the necessary equipment for the start of the four tunnel drives two caverns each with a length of 200 m and a cross section of 210 m2/lfm were built. This contribution describes the backfilling works of the 85,000 m3 of cavity built for temporary demands. Requirements for the backfilling materials, installation, and logistical boundary conditions are explained.