错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Energy management system optimized for profit maximization of a photovoltaic plant with batteries applied to the short-term energy market

  • Liane Marques de Oliveira,
  • Camila Seibel Gehrke,
  • Micael Praxedes de Lucena,
  • Lucas Haas,
  • Sidnéia Lira Cavalcante,
  • Lucas Vinícius Hartmann,
  • Flávio da Silva Vitorino Gomes,
  • Italo Roger Ferreira Moreno Pinheiro da Silva

摘要

Photovoltaic (PV) generation plants, due to the intermittent nature of their output power, can benefit from the integration of Battery Energy Storage Systems (BESSs). In this context, this work proposes an optimized energy management system (EMS) for a joint operation of BESS in utility-scale PV plants (PV/BESS) aiming to profit maximization. The optimization of the BESS operation was achieved from the genetic algorithm, and for the problem formulation, the following cost functions were defined in the objective function: the energy pricing system; the costs associated with degradation and total loss of the batteries; the penalty related to exceeding the maximum power contracted. The proposed EMS defines the reference for a BESS to be integrated into a PV plant located in Coremas, Brazil. The results were obtained from a simulation architecture similar to the PV plant and demonstrated positive financial gains, compared to the operation of the PV plant without BESS. In the simulation of a whole year of operation, it was possible to achieve an additional daily revenue gain of up to 11%.