<p>This study aims to describe a new approach to managing the reduction or elimination of cable end waste during the Bowden cable trimming operation in production lines since this waste represents thousands of meters of wasted cable per year, which is unsustainable from an economic and environmental point of view. This study has shown how the implementation of the DMAIC cycle (Define, Measure, Analyze, Improve, Control) in an automotive component industry can lead to a very significant reduction in material waste and, consequently, a reduction in the number of workers on certain assembly lines. Improvement actions were defined and implemented once the factors capable of eliminating and/or reducing cable trimming on the assembly lines had been identified. With the actions implemented, about the case study used for validation, an annual gain of approximately €89,289 has been achieved and a gain of €288,343 will be achieved by approximately 2026, after the elimination of trimming on five assembly lines and the reduction of trimming on eight assembly lines.</p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Mitigation strategies for waste elimination and cost reduction in the manufacture of Bowden cables

  • Luís Koch,
  • Francisco José Gomes da Silva,
  • Raul Duarte Salgueiral Gomes Campilho,
  • José Carlos Vieira de Sá,
  • Rafael Resende Lucas,
  • Rita de Cássia Mendonça Sales-Contini

摘要

This study aims to describe a new approach to managing the reduction or elimination of cable end waste during the Bowden cable trimming operation in production lines since this waste represents thousands of meters of wasted cable per year, which is unsustainable from an economic and environmental point of view. This study has shown how the implementation of the DMAIC cycle (Define, Measure, Analyze, Improve, Control) in an automotive component industry can lead to a very significant reduction in material waste and, consequently, a reduction in the number of workers on certain assembly lines. Improvement actions were defined and implemented once the factors capable of eliminating and/or reducing cable trimming on the assembly lines had been identified. With the actions implemented, about the case study used for validation, an annual gain of approximately €89,289 has been achieved and a gain of €288,343 will be achieved by approximately 2026, after the elimination of trimming on five assembly lines and the reduction of trimming on eight assembly lines.